Removal of Roof at Bradyl Court

Due to habited rooms and the time of year a temporary cover was constructed prior to roof removal. The installation of structural steelwork enabled us to form a feature vaulted ceiling over the bedroom and storage areas over the new ensuite and dressing room. Contract time was ten weeks.

© 2017 by Garry Ditchfield. Proudly created with wmdesigns.co.uk