29.10.2014 Refurbishment

House Rebuild in Ribchester

A seven month timescale to demolish a tired bungalow and build a bespoke home.

We were recommended to the client by a pervious customer. They had gone in to meticulous detail to design a home specifically for there requirements.

A large dinning kitchen, equally large lounge,open plan stairway with gallery landing, office, utility and shower room on the ground floor with integral garage complete with remote garage door. Two guest rooms and master suit with dressing room and en-suit bathroom on the first floor. The master bedroom having the amazing view from the glazed balcony.

Internally all the woodwork is solid oak with underfloor heating beneath the oak and tile floors.

photophoto-1photo-2

photo-3photo-5photo-4-2

Gary was recommended to us by the one of his former clients. We were told he would be reliable, would not cut corners, would turn up every day, have an attention to detail and offer suggestions on how to do a particular job better or more cheaply than working strictly to plan. This proved to be the case.

We have found Gary to be scrupulous in his approach to buildings our house. His team works hard and keeps to a strict daily schedule, working in some tough wet conditions during the winter. He himself works hardest of all in the team, leading by example and with a thinking approach.

Gary has been a very good builder to work with. He has approached the project with intelligence and a desire to produce the best outcome for us. He has helped us tackle a number of problems throughout the building process including dealing with third parties such as building inspectors and utilities.

We went with Gary’s recommendations for other tradespeople and were happy with this. If we had another project in mind we would wait until Gary was available rather than employing another builder. One friend remarked that if she ever wanted a builder she would want to use Gary because she saw that he was on site every morning at 8 am come rain or shine. He is the most reliable builder we have ever come cross. We can thoroughly recommend him without hesitation. He built for us a remarkable house which everybody comments on.

27.02.2014 Extensions

Woodplumpton Kitchen Extension

Demolition of kitchen extension and outbuildings to allow for construction of kitchen/lounge, bathroom, utility room and garage.
Work started in July of 2013 on this project.
We demolished the rear kitchen extension and outbuildings then built the large day room which flows through to the open plan kitchen. Beyond that there is a bathroom, utility and garage. 6.4m wide bi-folding doors were fitted with 10 interlocking “Velux”windows which wrapped over the roof above the doors. The installation of the “Velux” windows gained us 5* installers accreditation with “Velux”.
The whole house was re-rendered and the driveway laid with permeable block paving.
Work was completed in November.

before-1during-1
after-2after-1

We asked Gary to undertake the build and project management after providing a detailed and very competitive quote. He was happy to meet and liaise with suppliers to plan how best to achieve the design we wanted.
The skilled team that Gary brought in we’re reliable helpful and tidy. Even though the build touched upon every room in the property, they made it possible for us to remain in the house throughout. We found the advice and recommendations of how ideas could be improved invaluable and has resulted in a fabulous extension that shows quality workmanship.
We are extremely pleased with the whole build which came in on budget and on time. A big thank you to Gary and his team from Helen, Alan and family Woodplumpton

05.09.2013 Refurbishment

Cottage refurbishment in Dutton

Complete refurbishment of a remote property followed the addition of two extensions. The whole of the property was then covered in larch cladding. The project was carried out over winter and took approximately 5 months.

photo_newphoto2_new
photo2photo

If Gary Ditchfield accepts you as a client you can be confident that from that point your project will be managed effectively and professionally.  You can be assured of an outstanding build. Snap him up!

  • Solution Focused
  • Exceptional attention to detail
  • highly skilled

Carol Hardy.  Dutton, Lancashire.

05.09.2013 Loft Conversions

Attic conversion and remodelling in Waddington

Complete removal of roof of a timber framed property in Waddington.  Installation  of attic trusses to create two bedrooms and 2 en-suite bathrooms. A new entrance porch to the front of the property was added and a glazed feature bay window to the rear. The ground floor was also completely remodelled. Start to finish 10 weeks.

d837235bc8ea87cef4ae20b9ddb2f258c9b209c8252ed54a40c828bbf7d2f3b8photo3photo2photo

Our recent house re build was carried out by Gary Ditchfield LTD.It was to our complete satisfaction, on time and on budget.
We cannot fault their workmanship, integrity and dedication. Just the opposite from ‘ Builders from Hell ‘ !!!
Even the neighbours said it was a pleasure to have them around.
Good luck to Gary and his team.
Mr & Mrs Dawson – Waddington

14.11.2012 Uncategorized

House extension, Eastham Street, Clitheroe

House extension over three floors with the addition of entrance porch to the side elevation and conversion of the unused areas of the loft.

Particular attention to detail was carried out in order to retain the character of the house, reclaimed green slate, terracotta tiles inserted over the windows and construction of buttresses to match the front elevation. The whole of the building was the re-rendered using yellow sand and a limestone/quartz dash. On completion we built the retaining walls around the garden. read more

30.07.2012 Uncategorized

Rowan Croft, Clayton Le Woods, Chorley

Mr and Mrs Ormerod.

A recent alteration from a brick and single glazed conservatory that could only be used in summer
time, to a lovely insulated room that can be used all year round has made all the difference to our
home.

read more

05.09.2011 Uncategorized

Re-roofing at Pleasington

Complete re-roof of the house using slate effect concrete tiles and full replacement of fascias and rain water goods. Due to the age of the property and sagging rafters a lot of preparation work was needed to ensure flat/straight roof slopes. The re-roof took 10days.

read more

05.09.2011 Uncategorized

New Patio area and garden in Balderstone

Nearly 90 tons of earth was excavated to transform the rear garden of this property. The random stone walls are a perfect to the stone work on the house. Outdoor lighting and power ensure that the garden can been enjoyed well into the evening. From start to finish excluding planting my team were on site for 4 weeks.

read more

05.09.2011 Uncategorized

New reception area at Training 2000 Nelson

Training 2000 have been regular clients for approximately 7 years. Over this time we have carried out work ranging from minor repairs to the recent refurbishment of the reception area at the Nelson training facility. The removal of internal walls and storage rooms created and open and modern reception area. The construction of an aluminium/glass partition with integrated Venetian blinds forms the new call centre.

read more

05.09.2011 Uncategorized

Rear extension to form new dining kitchen at Keswick Drive

A rear extension to form larger dining kitchen. The day before we started our client left to spend 5 weeks at there holiday home in Spain. Regular photos and emails ensured the job was carried out to the clients requirements. By the time they had returned the job was finished and we had left the property.